Kennedy & Violich Architecture, Ltd.

01.02.13Bent Wood Vault

Beaver Country Day School's new entry space, built alongside a 1929 Guastavino vault. More like this

Web

09.06.12Almost Done

Beaver Vault, awaiting a few minor touch-ups before the start of the school year More like this

Web

08.02.12Last Push

The Vault Team (Alex, Diana, Blair, Shevy, and Chris) making final plans for lifting this morning. More like this

Web

07.29.12Final Coat

Bent Wood Vault ribs drying in the "meat locker", at New England Shutter Mills. More like this

Web

07.11.12Bent Wood Vault Model

A model of our Bent Wood Vault next to the 5-axis mill - soon to be cut at full scale! More like this

Web

07.02.12Bent Wood Vault Model

Having some fun with a 1:10 scaled model for the Beaver Country Day School. More like this

Web

06.27.12Bent Wood Vault Modeling

The KVA team working with our structural engineering consultants on the Bent Wood Vault More like this

Web